FDOT plans work on US 27 at SR 78

Posted 7/26/23

Florida Department of Transportation (FDOT) wants to use Industrial Drive as a bypass...

You must be a member to read this story.

Join our family of readers for as little as $5 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

FDOT plans work on US 27 at SR 78

Posted

MOORE HAVEN -- Florida Department of Transportation (FDOT) wants to use Industrial Drive as a bypass to connect SR 78 to US 27 while work is underway on SR 78.

At their July 24 meeting, the Glades County Commission considered a temporary license agreement with FDOT for FDOT to use Industrial Drive for the construction of roadway improvements for the unpaved portion of Industrial Drive, including a connection with US 27 so that Industrial Drive can be used as a bypass for the SR 78/US 27 intersection during FDOT’s repair work.

FDOT would bear the cost of paving the rest of Industrial Drive.

The commissioners agreed to have the county attorney negotiate the terms.

FDOT, US 27, SR 78

Comments

x