Collier County Road Watch Report for week of Dec. 30

Posted 12/28/23

The following column is the Road Watch report for Collier County for the week beginning Sunday, Dec. 30...

You must be a member to read this story.

Join our family of readers for as little as $5 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

Collier County Road Watch Report for week of Dec. 30

Posted

COLLIER COUNTY — The following column is the Road Watch report for Collier County for the week beginning Sunday, Dec. 30, provided by the Florida Department of Transportation.

Motorists are reminded to wear safety belts and drive with caution, courtesy, common sense, and patience as they travel through work zones. Remember, speeding fines are doubled in work zones.

I-75 from mile marker 76 to the mile marker 100/Toll Plaza: (Construction project) Crews will widen and resurface the roadway as well as construct new guardrail and wildlife crossings.

Motorists should expect intermittent southbound and northbound lane closures during daytime hours throughout the duration of the project.

Motorists should use caution as crews work on the roadway. The expected project completion is spring 2024.

I-75 from the Broward County line to the east of the bridge over Wildlife Crossing #15: (Construction project) Crews will widen and resurface the roadway as well as construct new guardrail and wildlife crossings.

Motorists should expect daytime ramp closures at the Recreational Area at MM 70 on I-75 northbound from 7 a.m. to 6 p.m. for guardrail repairs.

Motorists should expect intermittent southbound and northbound lane closures during daytime hours throughout the duration of the project.


Motorists should use caution as crews work on the roadway. The expected project completion is spring 2024.

I-75 at SR 951 (exit 101) Interchange Improvements: FDOT is reconstructing the I-75 southbound on and off-ramp connections and the northbound on-ramp connection to the mainline lanes at SR 951 (exit 101). The northeast quadrant loop ramp will be connected to, and accessible only by, a direct flyover ramp from northbound Collier Boulevard starting south of the Davis Boulevard intersection. This single-lane flyover ramp will carry traffic over Beck Boulevard and a reconstructed I-75 southbound on-ramp. A single-lane flyover ramp extension will carry I-75 southbound traffic over Davis Boulevard to a new signalized intersection at Collier Boulevard and Business Circle North. This ramp will extend along the western side of Collier Boulevard.

Motorists should expect limited work until Tuesday, January 2, 2024.

Crews are also currently constructing the noise wall on the south side of I-75, just west of the interchange. The contractor does not expect impacts to traffic with this activity.

Crews are also currently working at northbound SR 951 at the I-75 southbound on-ramp. Motorists should expect truck traffic during daytime hours. The contractor does not expect impacts to traffic with this activity.

Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is spring 2026.

US 41 at Oasis Visitor Center: (Construction project) Crews will construct an eastbound left turn lane from US 41 at the Oasis Visitor Center. Additional improvements include lane widening, guardrail installation, resurfacing, and new signage and pavement markings at the intersection.

Motorists should expect intermittent lane closures and shifts during daytime hours from 7 a.m. to 5 p.m. throughout the duration of the project.

Motorists should use caution as crews work on the roadway. The expected project completion is early 2024.

Shoulder closures and bicyclists flagging operation during daytime working operations.

US 41 from 10th Street North to 9th Street North: (Maintenance permit project) Motorists should expect intermittent northbound and southbound lane closures during nighttime/overnight hours from 7 p.m. to 5 a.m. while crews construct underground utilities. A temporary traffic signal will be installed during construction. Motorists should expect slow-moving traffic and possible delays.

US 41 at the Treviso Bay Entrance east of Johns Street: (Maintenance permit project) Motorists should expect intermittent northbound lane closures during nighttime/overnight hours from 7 p.m. to 5 a.m. while crews make turn lane modifications. Motorists should use caution as crews work on the roadway.

SR 84/Davis Boulevard from Ospreys Landing to West Crown Point Boulevard: (Maintenance permit project) Motorists should expect intermittent westbound lane closures during nighttime/overnight hours from 7 p.m. to 5 a.m. while crews replace underground utilities. Motorists should expect slow-moving traffic and possible delays.

SR 670 9th Street North to Tamiami Trail: (Maintenance permit project) Motorists should expect intermittent southbound lane closures during nighttime/overnight hours from 7 p.m. to 6 a.m. while crews construct a turn lane. Motorists should expect slow-moving traffic. Motorists should expect to work during weekends from 7 p.m. to 6 a.m.

Copeland Avenue from Chokoloskee Bridge to Broadway Avenue: (Construction project) Crews will construct sidewalk on the east side of Copeland Avenue from Chokoloskee Bridge to Broadway Avenue. Crews will install temporary signalization within the project.

Motorists should expect intermittent lane closures during daytime hours from 7 a.m. to 5 p.m. with possible flagging operations throughout the duration of the project.

Motorists should use caution as crews work near the roadway. The expected project completion is early 2024.

US 41 From East of Whistler’s Cove Boulevard to West of Collier Boulevard: (Construction project) Crews will be working on widening areas, curb construction, and installation of permanent signs throughout project limits.

Motorists should use caution as crews work near the roadway.

As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state.

collier county, road watch, construction, maintenance

Comments

x